INTRODUCE
INTRODUCE

INTRODUCE

GENERAL INTRODUCTION

NINJA Q CO., LTD. was established in September, 2016 in Quy Nhon City, Binh Dinh Province, is a subsidiary company of GIFU KOGYO VIET NAM (the head office is located in “Quang Trung Software City”, District12, HCM City). We currently have 56 employees, with professional technology and foreign language level such as Japanese or English. We are on the move to develop into a reputable company in deploying technical drawing field.

NINJA Q CO., LTD. specialize in meeting the outsourcing needs of Japanese companies, the market always requires precision in quality as well as the strictness of delivery. We always confidently satisfy the requirements of deploying technical drawing. NINJA Q also specializes in meeting the needs in the field of website design, outsourcing management software, construction of mobile applications … (See details)

In addition, we are committed to 100% data security with advanced data management system so always receive absolute trust from customers.

 

Our company motto

We always wish to bring satisfaction to our customers by providing the best quality products and services.

 

Busineses introduction

Giới Thiệu Nghiệp Vụ

– Create detail drawings for formwork tunneling and steel structures in the field of construction, bridges, roads, architecture, etc.

– Create laser cutting data with complex shapes.

– Convert to CAD data from hand drawings.

Working process

Japanese style of work is applied to the production process, so that the products always achieve the best quality and satisfy the needs of customers.

STEP 1 Orders received
Customer send general design drawings and related documentation to NINJA Q.
NINJA Q analyze general design drawings and related documentation, then deployed to the operator.
STEP 2 Make drawings on request.
In the process of drawing, gather questions by excel file, etc. and confirm with the customer via email.
Based on the customer response, reflect in the drawing.
STEP 3 Continue make drawings.
After finishing the drawing, the operator will check the drawing and then submit to the superior.
The superior will check the drawing for the second time
(thoroughly enforce the double check process to ensure quality)
STEP 4 Submit to the customer final drawings and checked drawings.
If customer feedback, NINJA Q will base on that requirement and reflect on correcting drawings.
STEP 5 Submit completed drawings
STEP 6 Finish the process
NGUYEN DUC TAI
NGUYEN DUC TAI

Department manager
Manage and deploy drawing processing

LUU VAN THOAI
LUU VAN THOAI

Department manager
Manage and deploy drawing processing

NGUYEN HUYNH TAN DAT
NGUYEN HUYNH TAN DAT

Section manager
Manage and deploy drawing processing

TRAN DINH THINH
TRAN DINH THINH

Section manager
Manage and deploy drawing processing

NGUYEN TRAN THANH TAM
NGUYEN TRAN THANH TAM

Team Leader
Design and deploy drawing

PHAM NGOC CHUNG
PHAM NGOC CHUNG

Team Leader
Design and deploy drawing

DINH XUAN LAM
DINH XUAN LAM

Team Leader
Design and deploy drawing

NGUYEN QUOC ANH
NGUYEN QUOC ANH

Team Leader
Design and deploy drawing

TRAN NGUYEN THANH THUY
TRAN NGUYEN THANH THUY

Captain
General administration

VO THI BUP
VO THI BUP

Captain
Design and deploy drawing

TRAN PHUOC PHUC
TRAN PHUOC PHUC

Captain
Design and deploy drawing

TRAN TUAN ANH
TRAN TUAN ANH

Captain
Design and deploy drawing

VO NGOC QUANG
VO NGOC QUANG

Captain
Design and deploy drawing

NGUYEN HO CANH
NGUYEN HO CANH

Captain
Design and deploy drawing

CAO THANH CHUNG
CAO THANH CHUNG

Captain
Design and deploy drawing

NGUYEN KE MEN
NGUYEN KE MEN

Captain
Design and deploy drawing

HOANG TAN DAT
HOANG TAN DAT

Captain
Design and deploy drawing

NGUYEN VAN HAN
NGUYEN VAN HAN

Captain
Design and deploy drawing

NGO QUOC TRUNG
NGO QUOC TRUNG

Technical staff
Design and deploy drawing

DINH CONG NHAT
DINH CONG NHAT

Technical staff
Design and deploy drawing

DOAN THE DONG NGUYEN
DOAN THE DONG NGUYEN

Technical staff
Design and deploy drawing

NGUYEN VAN THIEN
NGUYEN VAN THIEN

Technical staff
Design and deploy drawing

TRAN THI TIEU HIEN
TRAN THI TIEU HIEN

Technical staff
General administration

TRAN THI LE TRINH
TRAN THI LE TRINH

Technical staff
Design and deploy drawing

TRAN NGUYEN MINH CHAU
TRAN NGUYEN MINH CHAU

Technical staff
Design and deploy drawing

TRAN TAN DINH
TRAN TAN DINH

Technical staff
Design and deploy drawing

TRUONG TIEN THINH
TRUONG TIEN THINH

Technical staff
Design and deploy drawing

NGUYEN SI HAU
NGUYEN SI HAU

Technical staff
Design and deploy drawing

NGUYEN TRONG LICH
NGUYEN TRONG LICH

Technical staff
Design and deploy drawing

Work environment 1
Work environment 2
Work environment 3
Work environment 4
Work environment 5
Work environment 6
Work environment 7
Work environment 8
Work environment 9
Work environment 10
Work environment 11
Work environment 12
Work environment 13
Work environment 14